6-8, allée du Val du Moulin - B.P. 69 - 93240 STAINS - FRANCE
Tél. : 33.1.48.26.62.12 - Fax : 33.1.48.22.37.15 - E-mail :
pouget.rail@wanadoo.frWeb : www.
pougetrail.comTese Specifications are given for your information only
and may be technically modified and improved.
TRANSPORT ON TRACK
Made in
2/4
PER-1
MOVABLE SCAFFOLDING BRIDGE
USE :
Maintenance Works of Tunnels and Underground (Metro)
ADVANTAGES :
Ultra-light Equipment allowing the complete Maintenance Works in Tunnel, on all
the width, and with a Total Safety.
TECHNICAL CHARACTERISTICS
:
1) ON THE TRACKS
4 Aluminium Lorries with Wheels dia. 250 mm., of which two are equipped with brakes.
2 Complete Scaffoldings in aluminium, with movable floors, plinths and handrails, on the 4 lorries.
2) ON THE PLATFORMS
2
Aluminium Scaffolds, adjustable in height, with movable floors, plinths and handrails.
2 Support-Scaffolds with nylon Wheels, equipped with brakes.
Dimensions :
Width
Length
Height
2,60 m.
9.90 m.
Adjustable in function of the layout of Tunnels.
This Movable Scaffolding Bridge runs simultaneously on the two Tracks, and the 2 sides of the Platforms.
It is completely adjustable in height as the layout of the Station. Its components in aluminium-tubes are very
light, and easy to assembly by 4 Workers in 20-25 minutes.
It is equipped with brakes on Tracks, and on Platforms.
The
PER-1
Scaffolding-Bridge is approved by «APAVE» Office.